Recently Completed Contracts
MULTI-SERVICE PROJECTS
Shell Nelson: Provision of
the abrasive water jet cutting system
and caisson repair equipment for the repair of caissons.
Wintershall F-16A Jacket Installation: Provision
of 72" Hydra-Lok Swage Tools and Latch-Lok Jacking Tool, used during the installation of the jacket for jacking and
securing the structure to it's piled foundations.
Taylor Energy (GOM) Jacket Installation: Provision
of 84" Hydra-Lok Swage Tools and Latch-Lok Jacking Tool for securing
the structure to it's eight x 84" piled foundations.
Clyde Q4C Jacket Installation: Provision
of 54" Hydra-Lok Swage Tools, Latch-Lok Jacking Tool and Skirt Pile
Grippers, used during the installation of the jacket for jacking and
securing the structure to it's piled foundations. The Abrasive Water Jet
Cutting system was also supplied to facilitate removal of the 54"
pile stick-ups on completion of the swaging operations.
BP Clair Template Installation: Provision
of 30" Hydra-Lok Swage Tools and Latch-Lok Jacking Tool, used
during the installation of the template for jacking and securing the
structure to it's piled foundations. The Abrasive Water Jet Cutting
system was supplied for removal of the 60" docking pile stick-ups.
Marathon Brae 'B': Removal
of Dosing Tube from caisson using the abrasive water jet cutting system
and consequent repair using steel liner and 36" Caisson Repair
Tool.CUTTING
Wintershall K10 Jacket Removal: Provision
of Internal Cutting Tools and the Abrasive
Water Jet Cutting system for the cutting operations on the removal of
the K10 jacket in the Southern North Sea.
Offshore Mediterranean Topside
Removal: Provision
of External Cutting Tools and the Abrasive
Water Jet Cutting system for the cutting operations on the removal of
jacket topsides.
SA
Tripod Flare Tower Removal: Provision
of Internal Cutting Tools and the Abrasive
Water Jet Cutting system for the cutting operations on the removal of the
Flare Tower - Offshore India.
Shell Ketam Jacket Removal: Provision
of Internal Cutting Tools, Down Hole Cutting Tools and the Abrasive
Water Jet Cutting system for the cutting operations on the removal of
two jackets.
Komaritim Pipeline Project:
Provision
of Internal Cutting Tools, External Cutting Tools and the Abrasive Water
Jet Cutting system for the cutting operations on the pipeline and its
foundation piles.
BP Valhall Remediation Project: Provision
of 72" - 108" Internal Cutting Tools and the Abrasive
Water Jet Cutting system for the cutting operations on the removal of
five 96" piles.
HYDRA-LOK SWAGING
AIOC
Template Installations: Provision
of 30" Hydra-Lok Swage Tools for securing several structures to
their piled foundations.
Maersk Tyra Halfdan Template
Installations: Provision
of 24" Hydra-Lok Swage Tools for securing five structures to their piled foundations.
CAISSON
REPAIRS
Norsk Hydro Brage: Repair of corrosion damaged caissons
using steel liners and 27" Caisson Repair Tool.
Shell Gannet: Repair of corrosion damaged caissons
using steel liners and 36" Caisson Repair Tool.
Centrica Rough
47/3B: Repair of corrosion damaged caissons
using steel liners and 36" Caisson Repair Tool.
BP Bruce PUQ: Repair of corrosion damaged caissons
using steel liners and 36" Caisson Repair Tool.
BP Ula: Repair of corrosion damaged caissons
using steel liners and 36" Caisson Repair Tool.
Talisman Claymore: Repair of corrosion damaged caissons
using steel liners and 24" Caisson Repair Tool.
Talisman Tartan
PC12: Repair of corrosion damaged caissons
using steel liners and 665 mm Caisson Repair Tool.
BP
Everest / Lomond: Repair of six corrosion damaged caissons
using steel liners and 36" Caisson Repair Tool.
|